Bootstrap · before public launch
Roadmap & progress
Evrylife is being bootstrapped in the open. This page is refreshed from the protocol's own records — last refreshed 2026-10-04T01:32:53Z, control plane ECP v7.7.294.
Governance so far
107proposals adopted
54proposals in review
366problem reports confirmed
362builds verified by review
1,275review opinions recorded
Counted from the community relay. Bootstrap figures: reviews are decided by the bootstrap reviewer until the community reaches its hand-off milestones, and all pre-launch points reset at launch.
The phases
| Phase | What it is | Status |
|---|---|---|
P0 | One source of truth for the specification | ✓ Done |
P1a | Data replicates between browsers and community nodes | ✓ Done |
P1b | Secure connection so the public site can reach the network | Not started |
P1c | Durable storage: pinned copies and at least two community nodes | Not started |
P2 | Core loop: identity, content, feed, reviews and points | ✓ Done |
P3 | Automation engine | ✓ Done |
P4 | Feature completion and verification | In progress |
P5 | Every centralized service removed | ✓ Done |
P6 | AI agents running on decentralized compute | Not started |
P7 | Self-sustaining: app and specification on IPFS, treasury-funded operations | Not started |
P8 | Token launch and hand-off to the community | Not started |
Release gates
What must be true before each release stage, as recorded in the control plane.
| Gate | Requirement | Stage | Status |
|---|---|---|---|
RG-001 | 386-feature review sweep complete | pre-deploy | In-progress |
RG-002 | zkr-POGO task pool drained | pre-deploy | In-progress |
RG-003 | Base translations complete | pre-deploy | Pending |
RG-004 | Durability pinning live | production-deploy | Pending |
RG-005 | Always-on community relay/indexer deployed | production-deploy | Pending |
RG-006 | Frontend deployed to evrylife.eth / IPFS | production-deploy | Pending |
RG-007 | Contracts deployed to mainnet | TGE-handoff | Pending |
RG-008 | Governance ownership to Safe + Timelock (H1) | TGE-handoff | Pending |
RG-009 | Token ownership to governance (H2) | TGE-handoff | Pending |
RG-010 | Reconcile in-contract multisig with Safe (M3) | TGE-handoff | Pending |
RG-011 | Slashing front-run decision (M1) | TGE-handoff | Pending |
RG-012 | Key/secret sunset | TGE-handoff | Pending |
RG-013 | zkr-POGO community voting live | TGE-handoff | Pending |
RG-014 | Staking mandatory + points-to-token conversion live | TGE-handoff | Pending |
RG-015 | Airdrop trigger mode selected | TGE-handoff | Pending |
RG-016 | Treasuries activated (tp01-tp09) | TGE-handoff | Pending |
RG-017 | Liquidity venue selected (LBP, no sale) | TGE-handoff | Pending |
RG-018 | Treasury setTreasury to governance (L4) | post-TGE | Pending |
RG-019 | Semaphore eligible-mod set live | post-TGE | Pending |
Recently adopted by the community
- Trust the rebuilt community relay's signer and stop trusting the old one
- Evrylife Auth & Vault, part 2: serverless two-factor and a master wallet with limited sub-wallets
- Go live on the web3 stack now, with features gated: move the production gates ahead of the review gates
- Evrylife Auth & Vault, part 3: delays on spending and deleting, freeze-first, and opt-in recovery
- A community vote that closes without enough votes ends as 'not adopted', and the platform closes it when the window ends
- Name the bootstrap reviewers: the bootstrap badge waiver applies only to a governed list of accounts, starting with the owner's new account
- Only zkr-POGO-approved changes reach the code: an origin gate that fails closed on every build, and main advances only after the build's verification is approved
- Creator backgrounds: members may give their profile, channels and content an animated background (background only), under governed anti-misleading rules, moderated even w
Recent builds
Every build answers a community-confirmed report or an adopted proposal, and is verified by review before it counts.
- 2026-10-03 — A cast verdict never hangs on 'Recording your verdict': the after-write surplus check is bounded by the governed budget
- 2026-10-02 — A new browser finishes signing in: the engine restart stops waiting after the governed budget, and the pre-sign-in engine no longer walks history
- 2026-09-28 — The circles-e mark stays visible in day mode in every fade colour
- 2026-09-27 — VR Mode renders its preview and says plainly that VR is not built yet
- 2026-09-27 — The /features hero is readable the moment it renders
- 2026-09-27 — The scrolled header is solid when no background effect sits behind it
- 2026-09-27 — Explorer no longer flashes '0 Results' before content arrives
- 2026-09-27 — The Shop page has the app header and menu
- 2026-09-27 — Visitors see 'Follow', not 'Loading...' forever
- 2026-09-27 — Focus rings sit inside text boxes, never detached and clipped
- 2026-09-27 — 'Media unavailable' is readable in day mode
- 2026-09-27 — Explorer card buttons wrap instead of being cut off
Where this comes from: every figure on this page is generated at build time from the Evrylife protocol’s public control plane — ECP v7.7.294, 33 registries, 1,830 rows — read from a committed snapshot of the protocol's control-plane export. evrylife.org is an independent Foundation site that relays public protocol data: it is not a DAO-governed artifact and holds no protocol state of its own. Explanatory text is quoted from the public knowledgebase.